Pre-Construction Support for a Data Centre Development

Client: Specialist contractor
Sector: Data centres
Service: PCSA and pre-construction support
Result: Technical and regulatory issues resolved early, giving a compliant, buildable and commercially viable basis for detailed design.
Led by Stuart Whiting MCIOB AMSFE, Chartered Construction Manager.
The Brief
A specialist contractor brought HelmClad in during the pre-construction phase of a data centre development. The aim was to turn design intent into building envelope solutions that could be built, while optimising technical performance and managing commercial and contractual risk. The fast programmes demanded by AI hyperscale clients made off-site assembly a priority.
What We Did
Design and BIM validation: reviewed and redlined BIM models, drawings and specifications for performance, conformance, coordination and buildability
Value engineering and risk: identified project risks and VE opportunities, including off-site assembly to speed up delivery and improve quality control
Compliance and submissions: prepared system and product technical submissions, checking contractual conformance and compliance with European and local regulations
Stakeholder engagement: represented the contractor at client workshops and meetings, drafted proposal presentations, and worked with supply chain partners to obtain compliant solutions
The Outcome
By resolving technical and regulatory issues early, the contractor could develop its detailed design and construction method on a robust, compliant and commercially viable foundation. The benefits and risks of project-specific modular construction could be communicated to the end client so that they were aligned with the delivery strategy and programme.