Performance testing. Planning and overseeing tests of fire, air, water, wind, structural and impact performance, including BS 8414 large-scale fire tests and CWCT testing.
-
Visual mock-ups. Coordinating mock-ups so the design team and client can agree appearance and finishes.
-
Buildability prototypes. Trial assemblies that prove the system can be built as designed, with the intended sequence and tolerances.
-
Governance. Test specifications, quality assurance, witnessing, and clear records of results and any changes made.
How It Works
-
Plan. We agree the scope and configuration of the test specimen or mock-up, the programme and the cost forecast with your team and the test facility.
-
Prepare. We manage or review the specimen design and build so it represents what will be installed.
-
Procure. We manage or check the purchase and manufacture of components to ensure they match the design.
-
Build. We support the installers so the specimen is built as designed, and we are on site checking and photographing extensively.
-
Witness. We attend and oversee the test or mock-up, including any controlled dismantle.
-
Report. We record and analyse results, failures and fixes, and confirm what has been proven.