
When a façade fails or a cladding claim reaches dispute, the parties need a clear, evidence-based opinion on what went wrong and why. HelmClad acts as expert witness in building envelope matters, identifying the likely root causes of defects and where responsibility lies.

Who It's For
-
Solicitors and barristers acting in construction disputes
-
Insurers and loss adjusters assessing claims
-
Building owners, developers and contractors involved in defect disputes
What We Provide
-
Investigation of defects, including site inspection and review of design and construction records
-
Root-cause analysis covering design, product, manufacture and installation
-
Assessment of which parties were likely responsible for each defect
-
Expert reports, witness statements and evidence packs for claims, adjudication and mediation, plus review of legal letters, claim documents, KC opinions, other experts' reports and fire risk assessments
-
Reports prepared in accordance with CPR Part 35 where required
-
Early advice on the merits of a claim before formal proceedings
Why HelmClad
Our opinions draw on hands-on experience of designing, testing, manufacturing, installing and remediating these systems. That practical knowledge helps us explain technical issues clearly to non-technical stakeholders, and to give our opinion in a timely and efficient manner.
Stuart Whiting has been instructed by solicitors as an expert witness on multiple cladding and façade claims. Cladding claims experience also includes analysing and presenting factual cases, giving professional opinion, and presenting at legal meetings and proceedings.
Recent Instructions
-
Residential tower, cladding defects. Instructed by solicitors for the defendant to provide expert advice and an expert report. The work covered each alleged defect in the Letter of Claim, the link between the defects and the claimed fire safety and water ingress issues, responsibility, causation and compliance, and whether the claimed remediation scope was justified.
-
Multiple residential towers, cladding defects. Instructed by solicitors for the defendant to provide expert advice and a report, and to attend intrusive investigations. The work covered how defects alleged over a six-year period relate to each other, and whether the alleged fire safety and structural defects were likely caused by design or workmanship errors.

